 |
Technical Briefs
C-SHRP publishes Technical Briefs that highlight SHRP products or results of C-SHRP's complementary research
program. The briefs summarize technical reports and where appropriate, update the status
of research, product development or field applications since the publication of the
reports. Information on product status in Canada is provided where available. Technical
briefs are numbered sequentially as published and those briefs that are available in
French are noted with an "F".
Contact:
Jai Roberts, Project Manager
The Technical Briefs are in PDF
format. To view or download any of these documents, you will need to get Acrobat Reader .
Please visit the Adobe site
for the latest version of the Acrobat Reader.
| 23. |
Pavement
Structural Design Practices Across Canada
[~490k, 10 p.]
|
|
|
| 22. |
PCC
Pavements: Some Findings from US-LTPP and Canadian Case Studies
[~239k, 10 p.]
|
|
|
| Millennium
Research Brief 2 |
PAVEMENT
DESIGN AND PERFORMANCE:
Current Issues and Research Needs
[~33k, 8 p.]
|
Bulletin
de recherche no F2 du millénaire |
CONCEPTION
ET RENDEMENT DES CHAUSSÉES : Questions de l'heure et besoins en
recherches
[~42k, 10 p.]
|
| Millennium
Research Brief 1 |
ASPHALT:
Current Issues and Research Needs
[~25k, 6 p.]
|
Bulletin
de recherche no F1 du millénaire |
BITUME
: Questions de l'heure et besoins en recherches
[~32k, 8 p.]
|
| 21. |
Seasonal
Load Restrictions in Canada and Around the World
[~127k, 8 p.]
|
21F. |
Restrictions
saisonnieres de charge imposées au Canada et dans le monde
[~127k, 8 p.]
|
| 20. |
Anti-Icing
and RWIS Technology in Canada
[~130k, 8 p.]
|
20F. |
Entretien
hivernal des routes au Canada : Techniques antiverglaçe et SIMER
[~142k, 10 p.]
|
| 19. |
Superpave vs.
the Canadian Winter: Low Temperature Performance at C-SHRP Test Roads
[~142k, 8 p.]
|
19F. |
Superpave
et l'hiver au Canada : Rendement à basse température des tronçons
routiers expérimentaux du C-SHRP
[~122k, 8 p.] |
| 18. |
Roughness
Trends at
C-SHRP LTPP Sites
[~230k, 8 p.] |
18F. |
Tendances
à la rugosité des chaussées expérimentales des sites LTPP du C-SHRP
[~335k, 8 p.] |
| 17. |
Superpave
2000 - Improved Standards for a New Millennium
[~315k, 8 p.] |
17F. |
Superpave
2000 - Pour le nouveau millénaire, des normes améliorées
[~343k, 10 p.] |
| 16. |
Summary
of pavement smoothness specifications in Canada and around the
world
[~348k, 10p.]
Addendum to
Brief No. 16
|
|
|
| 15. |
Revised
low-temperature algorithms for SUPERPAVE mix design
[~405k, 8p.] |
15F. |
Algorithmes
révisés de conception des revêtements SUPERPAVE par basse température
[~ 405k, 8p.] |
| 14. |
Exposure
study of epoxy-coated reinforcement
[~23k, 6p.] |
|
|
| 13. |
Alkali-silica
reactivity
[~ 51k, 8p.] |
|
|
| 12. |
Epoxy-coated
reinforcement
[~ 1088k, 6p.] |
|
|
| 11. |
Canadian
asphalt binders and SUPERPAVE performance grades
[~ 52k, 4p.] |
11F. |
Les liants
bitumineux canadiens et les catégories de rendement SUPERPAVE
[~ 304k, 4p.] |
| 10. |
C-SHRP
test roads : early performance results
[~84k, 7p.] |
10F. |
Routes
expérimentales du C-SHRP : résultats initiaux liés à la performance
[~ 536k, 7p.] |
| 9. |
SUPERPAVE
binder specification and test methods
[~ 473k, 3p.] |
|
|
| 8. |
Bayesian
modelling : joint C-SHRP / Agency applications
[~ 84k, 7p.] |
8F. |
Projets
communs des responsables du C-SHRP et des administrations provinciales concernant
l'application de la méthodologie de modélisation bayessienne
[~ 526k, 8p.] |
| 7. |
Concrete
bridge component evaluation manual
[~ 1014k, 6p.] |
7F. |
Manuel
d'évaluation des composants de pont en béton
[~ 405k, 8p.] |
| 6. |
Measuring
the corrosion rate of reinforcing steel
[~ 1272k, 6p.] |
|
|
| 5. |
Concrete
durability
[~ 30k, 4p.] |
|
|
| 4. |
Highway
concrete (HWYCON) expert system
[~ 90k, 6p.] |
|
|
| 3. |
Shotcrete :
recommended practice for repair of highway bridges
[~ 1384k, 6p.] |
3F. |
Le béton
projeté : pratique recommandée pour la remise en état des ponts routiers
[~ 536k, 7p.] |
| 2. |
Electrochemical
chloride extraction from concrete bridge components
[~ 106k, 8p.] |
|
|
| 1. |
Maintenance work zone safety devices : development and evaluation
[~ 86k, 8p.] |
1F. |
Dispositifs de sécurité associés aux travaux routiers d'entretien :
mise au point et évaluation
[~ 91k, 8p.] |
|